It is a procedure to promote the innovations when it has not been possible yet to install them at construction sites or when it is proposed a designed solution for a particular site, with innovative or non-traditional techniques.
“The essential is to have courage to
risk and develop new ideas”
Zaha Hadid
The DITEX looks forward to promote both the installation on site of innovations as well as their building up procedures, allowing in this way, the assessment of the fitness for use of a material, system or construction procedure or prototype, within the following cases:
Type a): Material, product or kit, construction procedure, during the market introduction phase (prototype), for which it is not possible to provide previous reference works.
Type b): Construction solution designed for a particular construction site, for which where there are participating both non-traditional or traditional construction techniques.